Newcastle Track

Newcastle Track Opened on 8th December 2012 The new track is 14km long and runs on the true left of the Clutha River from the Hawea River Swing Bridge at Albert Town to near the Red Bridge at Luggate. , It creates a great loop track in conjunction with the Upper Clutha River Track. The […]